五月天青色头像情侣网名,国产亚洲av片在线观看18女人,黑人巨茎大战俄罗斯美女,扒下她的小内裤打屁股

歡迎光臨散文網(wǎng) 會員登陸 & 注冊

Czech-Polish Interconnector Gas Pipeline (CPI) - Stalled

2020-09-29 09:03 作者:_多言數(shù)窮  | 我要投稿

Czech Gas Firm Scales Back Poland, Austria Interconnector Plans

7/16/2020


PRAGUE (Reuters) —Czech gas pipeline operator Net4Gas has delayed and scaled back plans for new interconnections with Poland and Austria, the firm's updated investment plans shows.?



Net4Gas ships mainly Russian gas to the Czech Republic, parts of Germany, Slovakia and down to Austria, with gas mostly coming through Germany's Nord Stream pipeline.


The firm's 2021-2030 development plan shows the company has shelved its Czech-Polish pipeline project STORK II that was to boost cross-border capacity with Poland from 2023.


The project has been replaced by a smaller potential interconnection raising capacity from Poland, which may come online in 2027/2028.


It has also halted a connector to Austria called BACI that was seen going online in 2024, which may, however, be replaced by a smaller, similar project from 2026.


Net4Gas said the projects were shelved after they did not get on a list of EU-backed projects, and new capacity would be added depending on customer needs.


"The current 10-year plan does not expect the BACI and STORK II projects in their earlier planned form, mainly because they are not at the moment included in the European list of projects of common interest," Net4Gas said in response to Reuters questions.


It said the plan did include the alternative possibilities, whose delivery would depend on capacity auctions in 2021.


Net4Gas has been investing into boosting other parts of its infrastructure to significantly raise volumes it can ship from northern Germany.


The opening of the Nord Stream pipeline has led to a switch of traditional east-west physical flows through the Czech system to more north-south flows.


Net4Gas is owned 50-50 by Allianz Infrastructure Czech HoldCo II and Canada's OMERS pension plan.


Source:?https://www.gem.wiki/Czech-Polish_Interconnector_Gas_Pipeline_(CPI)

Czech-Polish Interconnector Gas Pipeline (CPI), also known as Stork II, is a shelved bi-directional gas pipeline in the Czech Republic and Poland.[1]

Pipeline Details

Owner: NET4GAS, s.r.o. / GAZ-SYSTEM S.A.

Capacity:

Length: 207 km / 128.6 miles[3]

Diameter: 39 inches

Status: Proposed

Start Year: 2022[4]

Cost: $305,996,600[1]

Background

The planned Czech-Polish Gas Interconnector, known as "Stork II"[2], consisted of the construction of a pipeline that would interconnect the existing transmission systems of the Czech Republic and Poland. Pipeline & Gas Journal reported on July 16, 2020 that the NET4GAS 2021-2030 development plan shows the company has "shelved its Czech-Polish pipeline project STORK II that was to boost cross-border capacity with Poland from 2023."[5]


The European Network of Transmission System Operators for Gas project codes are "TRA-A-136" (Czech-Polish Gas Interconnector (CPI)) and "TRA-A-273" (Poland - Czech Republic Gas Interconnection (PL section)).[1]


Czech-Polish Interconnector Gas Pipeline (CPI) - Stalled的評論 (共 條)

分享到微博請遵守國家法律
瓮安县| 全州县| 上虞市| 兴安县| 青州市| 云梦县| 九台市| 大关县| 黔西县| 溧水县| 八宿县| 望江县| 民乐县| 华安县| 梧州市| 安宁市| 屯门区| 木里| 澜沧| 临汾市| 积石山| 中山市| 松滋市| 云浮市| 高淳县| 松桃| 太谷县| 孙吴县| 安阳市| 齐齐哈尔市| 连江县| 宁波市| 琼海市| 郑州市| 全南县| 景洪市| 交城县| 仙桃市| 博乐市| 东港市| 沙洋县|